Year: 2019
Category: Industrial & Infrastructure
A cost-effective bridge solution over a historic column
The bridge’s foundations will be behind the existing floodwalls and will use the existing pier in the river. Pre-engineered, the bridge will be installed in two sections from the shore and will be 102 metres in length.
T.K. Justin Ng and Joshua Macdonald were a winning team of the Grand River Pedestrian Bridge Design Competition. They continued the development of the bridge with The Ventin Group. The bridge opened to the public in the spring of 2018.
T.K. Justin Ng
More by T.K. Justin Ng
View profile