MUNICIPALITY OF TORONTO, ONTARIO Reflected ceiling plan; Washroom design & Stair design.

Displaying the placement of different Materials, Electrical Fixtures, Structures, Referencing OBC. @ 1 : 100 Reflected Ceiling Plan (RCP) @ ground floor; Items indicated (but not limited to): .1 Base building plan (refer to attached CAD file), including new interior wall layout. .2 Suspended ceiling grid (1220x610) and (610x610). .3 Gypsum Board ceiling/bulkheads as appropriate to address good design, .4 Mechanical systems (HVAC & Fire Protection Sprinkler system). .5 Electrical systems (Light fixtures & Fire Protection signaling). .6 Miscellaneous ceiling systems (Access hatches). .7 Structural Grid. .8 Notes, dimensions, and reference markers. .9 Legend. .10 North arrows (true and project north).

Image showing the arrangement of Washroom fixtures Referencing OBC rules and regulations. @ 1 : 25 Washroom Plan; Items indicated (but not limited to): .1 Male and Female washroom plan layout (fixture requirements to be decided); .2 Universal washroom layout, complete with barrier-free shower as per OBC. .3 Notes and dimensions .4 Plumbing fixtures and accessories .5 Finishes and floor fixtures (i.e. ceramic tile, floor drains)

Image Showing all four Elevations from Inside With all the fixtures labeled by Legends. @ 1 : 25 Interior Washroom Elevations; Items indicated (but not limited to): .1 Male washroom (North, South, East, and West elevations); and .2 Universal washroom (North, South, East, and West elevations). .3 Plumbing fixtures and accessories .4 Finishes (i.e. ceramic tile, a baseboard) .5 Notes and dimensions

Fire Exit with all the rules and regulations from OBC. Section @ 1 : 40 Plan @ 1 : 25; Material Specifications: i. Basement level to Ground level = concrete stairs with 200 concrete landing including @ Ground level ii. Ground-level and above = steel stairs with C310x37 steel stringers; and steel platform construction (C130x13 platform framing with NR-20 metal deck and 65mm concrete topping) at all landings above ground level, including stair extending to the roof. Stair Section: Items indicated (but not limited to): .1 Structural Grid (reference centerline of the wall assembly and indicate as GL in gridline bubble) .2 Doors, frames, and direction of the door swing .3 Stair and landing construction .4 Handrails and guardrails .5 Hatch tone (concrete structure) .6 OBC requirements .7 Notes and dimensions .8 Elevation Height/Markers .9 Stair Detail referencing

Fire Exit with all the rules and regulations from OBC. Plan @ 1 : 25 Stair Plans (but not limited to): .1 Structural Grid (reference centerline of wall assembly and indicate as GL in gridline bubble) .2 Doors, frames and direction of door swing .3 Stairs (nosing), stringers .4 Handrails and guardrails .5 Direction of stair path of travel .6 OBC requirements .7 Notes and dimensions .8 Elevation Height/Markers .9 North arrows (project north)

The drawings here Illustrate how the connections take place. Different materials used. @ 1 : 5 .1 Notes and dimensions .2 Hatch (materials, etc.) Location: .1 @ typical stair landing platform and nosing; .2 @ ground to Second floor intermediate stair landing anchor connection to interior wall; .3 @ typical stair base at landing, showing landing frame